WERO first-aid cabinet M1Trio, with 2 adjustable shelves, empty

1 piece
// REF: 206006

€75.54*

Content: 1 piece

Available in 5 days, delivery time 1-3 days

Pcs
Product information "WERO first-aid cabinet M1Trio, with 2 adjustable shelves, empty"

Product information

Dimensions: 31.5 x 15 x 42 cm
Weight: 2.6 kg
Material: plastic, white

Technical details
Brand name: WERO
Bulky goods: No
Colour: white
Freight surcharge: No
Material: Plastic
Product group: R
Quantity content: blank
Sales unit: Piece
Weight: 2,6 kg
Product information
Small plastic first aid cabinet for storing first aid materials
With 2 adjustable shelves and 2 door shelves
1-door
Suitable for small fillings such as DIN 13157
Downloads
Product data sheet 
(PDF, 83 kb)

set_references

Rescue sign: First aid - means
Size: Medium
Adhesive film: standard, long photoluminescent In accordance with ASR A1.3:2013 and DIN EN ISO 7010Correct signage The newly revised workplace regulation (ASR) A1.3, which contains the internationally valid safety signs of DIN EN ISO 7010, has been in force since the first quarter of 2013. Until December 2012 and the publication of DIN EN ISO 7010, the essential safety signs in Germany were defined by DIN 4844-2, which now only applies as a German supplement to and in conjunction with DIN EN ISO 7010. The new version of ASR A1.3 dated 28 February 2013 replaces ASR A1.3:2007 and includes all the signs of the new DIN EN ISO 7010. The new ASR A1.3:2013 is therefore valid for all workplaces in Germany. If the employer does not apply the amended safety signs, he must carry out a documented risk assessment (§ 5 + 6 of the Occupational Health and Safety Act) to determine whether the safety signs used can continue to be applied. It must be determined whether the markings used in accordance with the old ASR A1.3 and BGV A8 enable employees to quickly recognise hazards, requirements and prohibitions. Important: Old and new markings should never be used in parallel!

€6.59*
incl. VAT plus shipping costs

Available in 5 days, delivery time 1-3 days

Pcs
Consultants on site